Feedback

Anything wrong or missing on this page? Please let us know!

Please don't use this for job-applications or promoting your company: we will delete your messages

To prevent automated spam submissions leave this field empty.

Toledo

Info

Timezone: 
GMT -5
UNCTAD: 
USTOL
Port authority: 
Toledo-Lucas Port Authority
Maximum draft: 
7.9m
Status: 
Port Open
Main port: 
USTOL

Contact

Contact person: 
Paul LaMarre, Manager of Maritime Affairs
You need an account on Dredgepoint to see this
+1 419 243 8251
+1 419 243 1835

Location

Toledo
United States

About

Dredging

Consistent dredging, coupled with proper disposal of the dredged material, is critical to the long-term sustainability of both the Port of Toledo’s industrial operations and the ecosystem of the Toledo Harbor. The Toledo-Lucas County Port Authority works in conjunction with the Army Corps of Engineers to monitor and manage the dredging of the Port of Toledo. We are also working diligently on non-traditional solutions for dredge material disposal such as the implementation of Habitat Restoration Units and the creation of soils and other blends for agricultural uses. Though there is a significant need for additional funding to address the dredging backlog and create new capacity for disposal, the Port of Toledo is 100% navigable and can accommodate any sized vessel utilizing the Great Lakes St. Lawrence Seaway System up to and including 1000’ lake-trading vessels.

 

Files

No files available

Images

Toledo Port logoToledo HarbourToledo Hharbour