| Timeframe | Equipment | Manager | Review |
|---|---|---|---|
Timeframe:
1925 - 2017
| Equipment:
| Manager:
| Review:
New owner
|
Timeframe:
2017
| Equipment:
| Manager:
|
Required Water Depth: 2.74 m,
Required Channel Width 24.38 mt
Dredging Range 2.74 minimum to 16.80 m maximum
Spuds: (2) spuds = (2) 1.72 m diam.
Cutter RPM 0-27.
No files available