Timeframe | Equipment | Manager | Review |
---|---|---|---|
Timeframe:
1994 - 2004
| Equipment:
| Manager:
| Review:
New owner
|
Timeframe:
2004 - 2007
| Equipment:
| Manager:
| Review:
New owner - renamed
|
Timeframe:
2007
| Equipment:
| Manager:
| Review:
Renamed
|
Feedback, 4th of November, 2010: Number of dredging pipe is 2, one for trailing suction and the other @ forword for stationary dredging. 3 engines 12PVBCS12-F and 1 engine EMD 16-645-E, Priyankara wimalarathna Ch/Engineer (1999 to 2007).
Original built as D.E.PATERSON. (1973 - 2004)
No files available