3 x APE Allen Ltd - 12PVBCS12-F and 1 x EMD 16-645-E
Speed (loaded):
10.5 knts
Total power:
7116 kW
Hopper volume:
2830 m³
Dredging depth:
26 m
Suction pipe diameter:
1.07 m
Number of dredging pipes:
1
About this page
Status:
Historical
Review:
Scrapped
Last Updated
43 weeks 3 days ago
About this equipment
Feedback, 4th of November, 2010: Number of dredging pipe is 2, one for trailing suction and the other @ forword for stationary dredging. 3 engines 12PVBCS12-F and 1 engine EMD 16-645-E, Priyankara wimalarathna Ch/Engineer (1999 to 2007).